Torrence Ave. Bridge over the Grand Calumet River
Contract: IDOT 60R95
Owner: Illinois Department of Transportation
- Demolition, Removal and Replacement of the Torrence Ave. Bridge over the Grand Calumet River.
- Drove 2,505 lf of H piles.
- Placed 1,920 cy of concrete.
- Installed 569,410 lbs of reinf steel.
- Erected 1,800,000 lbs of str steel.
- Installed 1,000 lf of 4.5′ dia drilled shafts.