Zion Nuclear power Station Restoration
Independent Spent Fuel Storage Installation
Engineer: ENERCON
- Site grading, drainage and soil preparation
- 25,000 square foot ISFSI foundations and apron for Spent Nuclear Fuel and Greater-Than-Class-C Casks
- 5,000 square foot monitoring building
- Vehicle barrier system and crash barrier
- ISFSI-area Heavy-Haul Path
- ISFSI-area construction site roads and dencing walkways
- Security system lighting, fencing, camera, and Perimeter Intrusion Detection System support equipment (i.e. poles, towers, brackets and wiring)
- Electrical work to support construction and permanent equipment requirements and environmental stewardship