63rd Street Bridge

Over I-90/94/CTA
Contract: IDOT 60J15

Owner: Illinois Department of Transportation

  • Removal and Replacement of the 63rd St. Bridge over I-90/94 & the CTA Red Line.
  • Placed 1,529 cy of concrete.
  • Installed 333,360 lbs of reinf steel.
  • Erected 498,000 lbs of str steel.
  • Temp shoring of the existing structure.