Adairsville Wastewater Treatment Plant

Owner: City of Adairsville, GA

North Wastewater Expansion and Upgrades

  • Upgrade and expansion of existing City of Adairsville North Wastewater Treatment Plant from 1.0 million gallons per day (MGD) to 2.0 MGD
  • A new triplex influent pump station, headworks with an automatic fine screen and grit removal system, aeration basin, secondary clarifier, duplex effluent filter pump station, effluent cloth media disc filter, UV disinfection system, aerobic digester, RAS/WAS pumps, SCADA system, splitter boxes, control building, miscellaneous yard piping
  • Work also includes adding an aerator to the existing aeration basin, converting the existing chlorination/dechlorination basin to a post-aeration basin with diffusers and a blower, demolition of the existing drying beds, demolition of the existing (abandoned) Adairsville South Wastewater Treatment Plant