Coppermine Water Reclamation Facility

Owner: Paulding County, Hiram, GA

MBR Treatment Capacity Expansion

  • Provide modifications to existing membrane bioreactors (MBRs)
  • Furnish/install new membrane units in existing MBR basins 2A and 2B
  • Construction of a new concrete sludge holding tank
  • Furnish/install new dewatering centrifuge/conveyor in existing solids dewatering building
  • Other piping, structural, electrical, and instrumentation/control improvements to connect new/upgraded facilities to the existing plant system

Headworks Improvements

  • Construction of a new elevated structure to support a pair of rotary drum screens and associated screenings dewatering units
  • Modification to the existing headworks structure including demolition of the existing screening equipment
  • Replacement of the existing odor control system serving the existing headworks structure
  • Associated site, mechanical, piping, electrical, and instrumentation improvements to tie the new systems into the existing treatment facility