Barack Obama Presidential Expressway Bridge Replacement Over Lemont Road
Contract: IDOT 62G39 Owner: Illinois Department of Transportation
Complete reconstruction of the existing bridge over Lemont Road
The existing bridge is PT concrete beams and will be replaced by structural steel beams
The actual length of the bridge is shortened, but the width remains the same
This project is to be completed in three phases
The proposed work includes new abutments, a mechanically stabilized earth (MSE) wall, a center pier, a bridge deck, roadway pavement, a barrier and parapet wall, street lights, and drainage