Wastewater Treatment Plant Improvements – Phase I

  • Construct new sludge dewatering and retaining wall and install sludge dewatering equipment including two belt press units, two polymer makeup systems, one polymer bulk storage tank, three sludge feed pumps, four conveyors, and an overhead crane system
  • Demolition of the existing sludge pump station, removal and replacement of two circular gravity thickener systems, and installation of concrete paving, yard piping, stormwater piping, electrical, mechanical, process piping, valves, coatings, earthwork, NPDES monitoring, erosion and sediment control, and grassing

Clarifier #2 Equipment Replacement

  • Clarifier equipment removal and replacement