Yorkville – Bristol Wastewater Treatment Plant

Engineer: Walter E. Deuchler, Aurora, IL

  • Expand plant capacity to peak flow of 10 MGD.
  • Furnish and install first ATAD (Autothermal Thermophilic Aerobic Digestor) system in the State of Illinois which provides Class A bio solids.
  • Self-performed the concrete work and equipment erectio

If you’re looking for a contractor who provides value and excellent service with a hands-on get it done attitude, hire us.

Follow Us:

2021 © IHC Construction Companies LLC