Zion Nuclear Power Station Restoration

Independent Spent Fuel Storage Installation
Engineer: ENERCON

  • Site grading, drainage and soil preparation
  • 25,000 square foot ISFSI foundations and apron for Spent Nuclear Fuel and Greater-Than-Class-C Casks
  • 5,000 square foot monitoring building
  • Vehicle barrier system and crash barrier
  • ISFSI-area Heavy-Haul Path
  • ISFSI-area construction site roads and dencing walkways
  • Security system lighting, fencing, camera, and Perimeter Intrusion Detection System support equipment (i.e. poles, towers, brackets and wiring)
  • Electrical work to support construction and permanent equipment requirements and environmental stewardship