Channel Improvement Project Engineer: Metropolitan Water Reclamation District of Greater Chicago
New Reservoir to Provide Flood Relief to Approximately 2,200 Structures Along Addison Creek in Northlake, Stone Park, Melrose Park, Bellwood, Westchester, and Broadview
Add Over 195 Million Gallons of Reservoir Storage
Demolition and Removal of All Remaining Structures, Foundations, Pavement, Utilities, and Underground Storage Tanks
Excavation and Removal of Contaminated Waste Encountered in Soil
Slurry Wall Installation
Pump Station and Discharge Structure Installation
Channel Improvements Include Excavation for and the Placement of Stone Riprap, Topsoil, Erosion Control Blanket, Seeding and Other Erosion Control Work
Completed Reservoir Will Provide $116 Million in Flood Benefits