63rd Street Bridge
Over I-90/94/CTA
Contract: IDOT 60J15
Owner: Illinois Department of Transportation
Removal and Replacement of the 63rd St. Bridge over I-90/94 & the CTA Red Line.
Placed 1,529 cy of concrete.
Installed 333,360 lbs of reinf steel.
Erected 498,000 lbs of str steel.
Temp shoring of the existing structure.