Rose Creek Wastewater Treatment Plant

Owner: Cherokee County Water & Sewerage Authority, Woodstock, GA

Odor Control Phase 3

  • The construction and start-up of the new two-stage chemical scrubber system
  • Aluminum covers installed on existing concrete tanks
  • Duct work, electrical and instrumentation systems
  • All other work required to provide a fully functional odor control system